One continuous floor

Replacing tile with hardwood in Ottawa

A tiled entry or kitchen can break up a hardwood main floor. New Era Flooring removes the old tile, prepares the subfloor, ties new hardwood into your existing floor and refinishes so the floor runs through as one surface.

What it covers

Tile removal, subfloor preparation, new hardwood woven into the existing floor, and sanding and refinishing to blend old and new.

Good for

Kitchens, entries and hallways where tile interrupts a hardwood floor.

Often paired with

Floor repairs and stain matching, sanding and refinishing.

Open kitchen and living area with one continuous oak hardwood floor where tile used to be
AI-generated illustration, not a New Era Flooring project photo.

How a tile to hardwood conversion works

We break out the tile and its mortar, then repair and build up the subfloor so the new hardwood sits level with the existing floor. The new boards are woven into the old ones, then the whole area is sanded and refinished together.

  1. Remove the tile and old mortar
  2. Repair and build up the subfloor to the right height
  3. Weave new hardwood into the existing boards
  4. Sand and refinish across old and new
New raw oak boards woven into an existing finished oak floor where kitchen tile was removed
AI-generated illustration, not a New Era Flooring project photo.

Matching the new boards to the old floor

We match the species and board width, and stain the new boards to blend with the old. Older floors have aged, so we tell you how close the match can get before the work starts. Sometimes refinishing the connected rooms gives the most even result, and we will price that option too.

When keeping tile makes more sense

In bathrooms, laundry rooms and other wet areas, tile is usually the better floor. If that is your room, see our ceramic and tile page for new tile over a properly prepared, waterproofed subfloor.

How a New Era project runs

One call covers the whole job. You can hand it all to us, or keep the parts you would rather handle yourself.

Tell us about the floor

Call or send the quote form. We come out, look at the floor and what is under it, and give you a price for the work you want.

Clear the rooms your way

Move the furniture yourself, or ask us to book the professional movers we work with. They photograph each room, move everything to another room, the driveway or a storage pod, and put it back where it was. Moving is optional and priced separately.

We do the work

Floors, carpets and stairs that are staying can be covered while we work. If the job needs an electrician or a plumber, we bring in trades we work with, or work alongside yours.

Clean up and move back in

We tidy and vacuum the work area when we finish. If you want the whole home cleaned before you settle back in, ask about a deep clean, priced separately.

Each step beyond the flooring work is optional and quoted on its own.

Tile to hardwood conversion questions

Yes. We have removed tile, tied new hardwood into the existing floor, refinished to match and taken the tile out altogether.

We match species and board width, stain to blend and refinish across the joined area. Matching has limits on older floors, so we tell you what to expect first.

We repair and build up the subfloor where the tile came out so the new hardwood sits level with the existing floor.

Not always. The joined area is sanded and refinished so old and new take the same finish. Whether the rest of the room needs it depends on the existing finish, and we will tell you before you decide.

Replace your tile with hardwood

Tell us which room has the tile, what the rest of the floor is and roughly how big the area is.